on a trial run down to red hook, NY i met up with some friends to work a bit doing construction. the first week has already held a myriad of challenges and jobs including pouring a concrete floor, stuccoing a chimney, moving seven pallets of concrete block (about 800 blocks) into a hole for a foundation, and dragging a large cast iron bathtub up a narrow flight of stairs.
the next few weeks could hold more of the same excitement as my friends have promised a
”non-stop work program.”
back don’t fail me now.